Wastewater Master Plan Development

Share Wastewater Master Plan Development on Facebook Share Wastewater Master Plan Development on Twitter Share Wastewater Master Plan Development on Linkedin Email Wastewater Master Plan Development link

The Municipality of Leamington is developing a Wastewater Master Plan (WWMP) for the Pollution Control Centre (PCC). This initiative aims to enhance the performance of our wastewater infrastructure, ensuring it can meet the needs of Leamington's growing community over the next 20 years. The WWMP will guide how the Municipality delivers wastewater treatment services, focusing on cost-effective, environmentally sustainable solutions that reflect the values and priorities of our residents.

About the Study

The study area for the WWMP includes the Leamington PCC and extends to the facility’s property line. Currently, the plant handles and treats wastewater from residential and light industrial sources across Leamington. However, a recent capacity analysis has identified several bottlenecks within the system. These bottlenecks are limiting the plant’s efficiency, capacity, and ability to support future growth in our Municipality.

To address these challenges, the WWMP will explore strategies to optimize existing infrastructure. This may involve unlocking additional capacity within the current plant through targeted improvements. If further capacity is needed to support anticipated growth, the plan will consider options for expanding capacity within the site’s existing boundaries.

Plan Phases and Community Involvement

The WWMP will outline a series of recommended projects across three timeframes:

  • Short-Term (0-5 years): Immediate priorities to enhance plant performance.
  • Medium-Term (6-10 years): Projects aimed at meeting mid-range growth forecasts.
  • Long-Term (11-20 years): Long-term strategies to ensure our infrastructure remains robust and adaptable.

The plan will detail expected capital costs, implementation timelines, and any additional studies that may be required for each project.

Community input is vital to the success of the WWMP. Throughout the planning process, the Municipality will engage with residents and local stakeholders to gather feedback and ensure the plan aligns with community needs and values. Public meetings, surveys, and other outreach activities will be conducted to keep you informed and involved every step of the way.

Get Involved

We encourage all Leamington residents to participate in the development of the Wastewater Master Plan. Your insights and feedback are crucial in helping us shape a plan that not only meets our infrastructure needs but also reflects the values of our community.

Stay tuned for upcoming opportunities to engage with the project team, share your thoughts, and learn more about how we are planning for the future of Leamington’s wastewater services.

The Municipality of Leamington is developing a Wastewater Master Plan (WWMP) for the Pollution Control Centre (PCC). This initiative aims to enhance the performance of our wastewater infrastructure, ensuring it can meet the needs of Leamington's growing community over the next 20 years. The WWMP will guide how the Municipality delivers wastewater treatment services, focusing on cost-effective, environmentally sustainable solutions that reflect the values and priorities of our residents.

About the Study

The study area for the WWMP includes the Leamington PCC and extends to the facility’s property line. Currently, the plant handles and treats wastewater from residential and light industrial sources across Leamington. However, a recent capacity analysis has identified several bottlenecks within the system. These bottlenecks are limiting the plant’s efficiency, capacity, and ability to support future growth in our Municipality.

To address these challenges, the WWMP will explore strategies to optimize existing infrastructure. This may involve unlocking additional capacity within the current plant through targeted improvements. If further capacity is needed to support anticipated growth, the plan will consider options for expanding capacity within the site’s existing boundaries.

Plan Phases and Community Involvement

The WWMP will outline a series of recommended projects across three timeframes:

  • Short-Term (0-5 years): Immediate priorities to enhance plant performance.
  • Medium-Term (6-10 years): Projects aimed at meeting mid-range growth forecasts.
  • Long-Term (11-20 years): Long-term strategies to ensure our infrastructure remains robust and adaptable.

The plan will detail expected capital costs, implementation timelines, and any additional studies that may be required for each project.

Community input is vital to the success of the WWMP. Throughout the planning process, the Municipality will engage with residents and local stakeholders to gather feedback and ensure the plan aligns with community needs and values. Public meetings, surveys, and other outreach activities will be conducted to keep you informed and involved every step of the way.

Get Involved

We encourage all Leamington residents to participate in the development of the Wastewater Master Plan. Your insights and feedback are crucial in helping us shape a plan that not only meets our infrastructure needs but also reflects the values of our community.

Stay tuned for upcoming opportunities to engage with the project team, share your thoughts, and learn more about how we are planning for the future of Leamington’s wastewater services.

  • Notice of Study Commencement and Public Information Centre (PIC) Leamington Wastewater Master Plan

    Share Notice of Study Commencement and Public Information Centre (PIC) Leamington Wastewater Master Plan on Facebook Share Notice of Study Commencement and Public Information Centre (PIC) Leamington Wastewater Master Plan on Twitter Share Notice of Study Commencement and Public Information Centre (PIC) Leamington Wastewater Master Plan on Linkedin Email Notice of Study Commencement and Public Information Centre (PIC) Leamington Wastewater Master Plan link
    supporting image

    The Study

    The Municipality of Leamington has initiated a Municipal Class Environmental Assessment (MCEA) study to enhance the performance of its wastewater infrastructure, ensuring it can meet the needs of Leamington’s growing community over the next 20 years. The Wastewater Master Plan (WWMP) will guide how the municipality delivers wastewater treatment services, focusing on cost-effective, environmentally sustainable solutions that reflect the values and priorities of its residents.

    The study area includes the Leamington Pollution Control Centre (PCC) facility, Cherry Lane and the Selkirk Drain South to Lake Erie (See map below).

    The Process

    The study will be completed in accordance with the Ontario Environmental Assessment Act and will follow the MCEA Schedule B requirements (Master Plan Approach #2) of the Municipal Engineers Association Manual (March 2023). This plan will outline a series of recommended projects to be implemented in the short term (0-5 years), medium term (6-10 years) and long term (11-20 years).

    How to Get Involved / Upcoming Public Information Centre

    The Municipality of Leamington would like anyone with an interest in this study to have an opportunity to provide input and help inform the decision-making process. The Municipality of Leamington will be holding a Public Information Centre (PIC) on November 20, 2024, to present the purpose and scope of the study, review the alternative solutions to address the problem and opportunity statement and identify a recommended solution.

    When: Wednesday, November 20, 2024, from 4:00 PM - 7:00 PM

    Location: Leamington Municipal Building, 111 Erie Street North, Leamington, ON

    Format: Drop in Open House (There will be no formal presentation)

    Comments are encouraged now and throughout the study. If you have comments or questions, require further information or would like to be added to the study mailing list to receive future notifications, please contact:

    Shannon Belleau, P.Eng. Manager of Environmental Services, Municipality of Leamington Tel: 519-326-5761 ext. 1650 Email: sbelleau@leamington.ca

    or

    Cristina Alfano, P.Eng. Project Manager AECOM Canada Ltd. Tel: 519-964-4181 Email: cristina.alfano@aecom.com

Page last updated: 22 Nov 2024, 11:25 AM